Duration of works: 4 years
Located on a former college site, this project was a combination of traditional, piled and ring beam and specific hybrid foundations.
Our work included:
All substructure build and beam and block oversites.
Specialist gas membranes to oversites.
Plot drainage and variety of private attenuation systems.
Tarmac, standard block paving and permeable block paved drives.
Masonry retaining structures, log rolls and gabion baskets.
Insitu grouting of existing abandoned sewers on site.
Completion of adoptable footpaths and stage 2 road works.
T. Balfe Construction Ltd
Richmond House
Brant Road
Fulbeck
Grantham
Lincolnshire
NG32 3JD
